Worked example with synthetic data · Operations & logistics

When does a second packing station help?

In this example, two hours of extra staffing clear a mid-shift surge as well as four. When the same number of orders arrives later, the two-hour schedule leaves 20 orders unpacked at dispatch.

The comparison

The decision is when to staff a second packing station during a four-hour dispatch window. Compare one station throughout, a second station during hours two and three, and a second station throughout. Assume one worker per station and a capacity of 48 orders per station per hour. The schedules add zero, two, or four worker-hours.

The hourly arrivals are constructed for this example. The mid-shift peak has 32, 64, 72, and 36 orders. The late peak has 32, 44, 60, and 68, for the same total of 204. The heavy peak has 32, 100, 102, and 36. Starting with an empty queue, add each hour’s arrivals to any backlog, subtract available packing capacity, and carry forward any orders that remain.

Orders exceed packing capacity in the final hourOrders per hour in the synthetic late-peak scenario. A second station is staffed in hours 2 and 3.

What the example shows

Staffing the second station in hours two and three clears all orders in the mid-shift case with two fewer worker-hours than full-shift staffing. When demand shifts later, the same schedule leaves 20 orders at dispatch. Staffing both stations throughout clears that late peak. During the heavy peak, both extra-staffing schedules clear the orders by dispatch, with up to 10 orders carrying over between hours.

Each cell shows the largest hour-end backlog followed by the backlog at dispatch, both in orders.
Arrival patternOne stationExtra station in hours 2–3Extra station all shift
Mid-shift peak40 / 280 / 00 / 0
Late peak32 / 3220 / 200 / 0
Heavy peak106 / 9410 / 010 / 0

Limits

The example uses fixed packing rates and hourly totals. It assumes orders and supplies are available to pack, workers can switch tasks without a delay, and dispatch follows the fourth hour. It estimates backlog at hour ends. Short queues within an hour, order mix, downtime, and the cost of moving staff from other work would need separate evidence.

What to measure

Measure when orders reach packing, how throughput varies by order mix, and when workers are available. Check the one-station calculation against recorded backlogs, then trial the second station during hours two and three. If late arrivals recur, compare moving the two-hour staffing block later with keeping the second station staffed throughout.